JOIN Seismic Upgrade

JOIN Seismic Upgrade

JOIN is an organization that reintegrates the homeless into home ownership. The organization owns a 2 story concrete building constructed in 1958. The building required a seismic upgrade as part of a remodeling project. Cascade Engineering provided a preliminary...
STEM Secondary School

STEM Secondary School

The highly compressed construction schedule for this secondary alternative school was met by using modular construction for the school building. Cascade Engineering provided the structural design of the 158 modules, which were constructed off-site. The greatest design...
Grays River Fire Station

Grays River Fire Station

Cascade Engineering led the design team for this FEMA funded project. The community’€™s previous firehouse was in the flood zone, and was often unusable because of high water. The new structure was a pre-manufactured metal building located above the flood plain....